The day after the blast was a rainout, but they had two drills and a jackhammer working on the Fourth (Yay...triple-time!)
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
98.13KB
24 downloads
It looks to me like they've been 'terracing' the side of the hill to work toward removing rock/dirt in stages as they whittle the hill away.
As they clear the rubble from the blast, it will create Level Three and that will be worked down to Level Two which will be worked down to Level One...I've heard that the Cabela store itself will be on Level One rather than take the hill all the way down to the level of Lee Highway.
The top of the hill won't be worked on till the new cell tower is in operation and the old one is removed. I wonder if a helicopter will be used to remove the old tower or or assemble the new one..we'll see!