Things now getting underway for the foundation layers for the retaining wall. Rolls of mat material were rolled out and cut to length on the Cabela's pad..
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
132.62KB
4 downloads
After precise work to get the elevation and level correct with the help of surveyor's transits, GPS and laser levelling the first base section is ready.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
117.22KB
5 downloads
The first mat is rolled out...
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
131.82KB
5 downloads
A total of four were used in an overlapping pattern and tie wraps used to keep them in position...
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
128.72KB
5 downloads
A load of the 4" and smaller material is dumped...
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
128.24KB
5 downloads
Gravel is spread across the mats - looked like about a 6" lift.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
130.97KB
5 downloads
Then a smooth vibrating roller compacted the layer.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
117.03KB
4 downloads
And the second layer begins.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
97.24KB
3 downloads
More on Saturday
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
142.81KB
2 downloads
And on Monday the area expands to 6 mats plus patches over the triangular gaps.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
112.17KB
2 downloads