Thursday's shot...
Before and After...
79.91KB 5 downloads
64.9KB 5 downloads
Posted 06 June 2014 - 06:50 PM
Thursday's shot...
Before and After...
79.91KB 5 downloads
64.9KB 5 downloads
Posted 09 June 2014 - 09:52 AM
Another big shot on the high rock wall today, material was moved three directions into areas where the excavators will have good access...
Before and After from 3 angles...
143.91KB 6 downloads
111.08KB 6 downloads
96.52KB 6 downloads
131.97KB 6 downloads
109.63KB 7 downloads
Posted 10 June 2014 - 09:43 AM
Back to the hill east of the Honda shop...
Before and After...
180.83KB 5 downloads
182.73KB 5 downloads
Posted 11 June 2014 - 01:26 PM
While excavating usable fill east of the Honda shop, many rock formations were uncovered so today was the day to break up some rocks!
Before and After and the same for a couple of closeups of the larger rocks...
160KB 6 downloads
181.32KB 6 downloads
271.52KB 6 downloads
260.81KB 6 downloads
237.28KB 6 downloads
230.83KB 6 downloads
Posted 13 June 2014 - 08:11 AM
Another shot along the ridge where the old road led up to the old tower...
Before and After...
167.58KB 4 downloads
140.87KB 4 downloads
210.67KB 4 downloads
198.41KB 4 downloads
Posted 16 June 2014 - 05:56 PM
Learned after the video that there will be at least one more shot along the high wall, then some smaller ones east of Honda to reach up toward the top.
Before and After on the left and right sides of the shot.
133.6KB 3 downloads
110.05KB 3 downloads
137KB 3 downloads
93.42KB 3 downloads
Posted 17 June 2014 - 10:24 AM
Another shot east of Honda...musta been some charges I couldn't see to the right of where I was aiming...
Before and After...
250.88KB 3 downloads
209.64KB 3 downloads
And you may have noticed the black screen for a bit in the vid...I bumped the still pic shutter, so "Pardon the Interruption"!
190.85KB 3 downloads
Posted 19 June 2014 - 08:47 AM
This shot east of Honda was nearly over before I started the camera!
Before and After...
227.73KB 4 downloads
177.52KB 4 downloads
Posted 26 June 2014 - 08:37 AM
I wasn't there the day of the last shot on the high wall and this may be nearly the last shot east of Honda. It depends on what they encounter as the material is removed after this shot.
Before and After...
123.35KB 3 downloads
115.74KB 3 downloads
Posted 30 June 2014 - 09:31 AM
All the way over near the trees alongside Lee Hiway today...
Before and After...
183.75KB 3 downloads
129.91KB 3 downloads
Posted 03 July 2014 - 02:33 PM
Goofy arrangement today...audio on the videos explains it.
Before and After on both sides...
167.09KB 4 downloads
153.85KB 4 downloads
192.2KB 4 downloads
186.79KB 4 downloads
215.02KB 4 downloads
223.56KB 4 downloads
Posted 10 July 2014 - 04:49 AM
Just a little late...
Before and After...
149.1KB 5 downloads
129.4KB 5 downloads
211.28KB 5 downloads
201.05KB 5 downloads
Posted 11 July 2014 - 07:33 AM
Out of range for the warning horn...again, late starting the vid...again:
Before and After:
115.11KB 6 downloads
120.68KB 6 downloads
Posted 17 July 2014 - 12:48 PM
Likely the last major shot on the remaining high wall:
Before and After:
145.31KB 5 downloads
136.38KB 5 downloads
122.45KB 5 downloads
167.35KB 5 downloads
Posted 17 July 2014 - 03:31 PM
So, after the shot yesterday it's time to start working off the loosened material...first video is with my Canon Power Shot S3 and the second is my first attempt uploading a video from my Moto X to YouTube. (Wish I'd tried some voice over comments.)
Three still pics...
142.24KB 6 downloads
148.9KB 6 downloads
149.84KB 6 downloads
Posted 21 July 2014 - 04:17 PM
East of the Honda shop again...thought the loaded pattern was much wider...oh, well.
Before and After:
124.92KB 6 downloads
89.76KB 6 downloads
Posted 01 August 2014 - 11:00 AM
No further Austin Powder activity since 7/16 and as material was being removed from the top, two rock seams have now been drilled for a shot next week.
163.29KB 4 downloads
115.32KB 4 downloads
They have also been clearing material after recent shots east of the Honda shop and have also drilled a pattern for another shot here.
123.84KB 4 downloads
Posted 04 August 2014 - 03:47 AM
Baker had more demo at the Harris building Saturday - left side of the building down and began stripping out the asphalt parking area.
138.76KB 4 downloads
On Monday the Austin Powder folks came in to set charges up on the hard ridges on top but dunno if they'll also include the pattern of holes by the Honda shop today.
151.06KB 4 downloads
Posted 04 August 2014 - 04:39 PM
Austin Powder was ready a little early today and the shot went of at 10:45, the video was taken from across the site.
The right end had the most charges but the hard ridges were loosened as well. Before and After:
151.37KB 4 downloads
110.09KB 4 downloads
220.82KB 4 downloads
The Harris building slab and parking lot has been cleared so now the crew can begin fill work to bring the grade up even with the earlier fill. A pic from above and the lifts begin:
165.67KB 3 downloads
163KB 3 downloads
126.34KB 3 downloads
Posted 04 August 2014 - 04:47 PM
The retention pond berms for stormwater runoff have been built up with clean clay fill and are now being covered with topsoil that had been stockpiled back in the beginning of site prep.
180.71KB 5 downloads
174.6KB 5 downloads
The entrance road for the project will soon be cut through from Lee highway at the intersection with Blevins Blvd. Looking from Blevins Blvd:
117.51KB 4 downloads
And looking back at it from the level of the Cabela's pad...lots more dirt and some huge boulders left:
95.51KB 4 downloads
0 members, 5 guests, 0 anonymous users