No shots till next Monday (2 diff places) so here's some random stuff. They're installing storm drain piping that will lead to the detainment pond:
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
165.55KB
1 downloads
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
162.47KB
1 downloads
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
180.99KB
2 downloads
They're also working on the foundation base for the retaining wall that goes along the Lowe's site near the freeway. This base requires a specified width and depth of material no larger than 4" and they use this angled frame to sift the larger material off the top and a front bucket gathers the good stuff from under the frame and adds it to a stockpile.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
135.6KB
4 downloads
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
136.45KB
2 downloads
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
141.48KB
4 downloads
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
134.5KB
4 downloads
The south end of the rock wall is slowly disappearing, excavator pulling down blocks and a hammer dealing with many that were pushed down from the other side.
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
138.44KB
3 downloads
Please Login or Register to see this Hidden Content
Please Login or Register to see this Hidden Content
168.75KB
3 downloads